TLDR:
Sub onboarding is where projects quietly leak time and margin. A repeatable workflow for scopes, docs, approvals, and change control keeps subs aligned, protects you, and stops Friday scrambles.
If you ask a contractor where projects lose time and margin, you’ll hear about materials, change orders, or client indecision. Fair. But there’s a quieter bottleneck hiding in plain sight: subcontractor onboarding and compliance. W-9s and COIs, lien waivers, scopes that drift, rates that “change,” expired insurance, text-thread agreements, and the Friday-afternoon scramble for signatures.
Let’s put a spotlight on it, then make it painless, predictable, and almost impossible to mess up.
Picture Maya, a GC who runs a tight three-crew operation. She wins a kitchen remodel, lines up demo, plumbing, and electrical, and fires off a few texts: “You good for Monday? Same rate? Send the new COI and W-9?” Everyone’s friendly. Everyone’s swamped. The job starts anyway.
On day two, the plumber’s helper shows up instead of the plumber. On day five, the electrician asks for 12% more “because copper.” On day eight, the client’s lender requests a certificate of insurance naming them as additional insured. Cue the inbox archeology. Somewhere, there was a PDF. Maybe.
No one’s trying to be difficult. But when onboarding and compliance live in texts, scattered emails, or a manager’s memory, your margin becomes a suggestion, not a promise.
The point of onboarding isn’t to bury subs in forms. It’s to lock in the most important parts of the job before a single hour is billed:
When those items are collected, validated, and visible, you gain leverage. Not to squeeze your subs, but to keep everyone honest and the project clean. It’s the difference between “I think we agreed” and “Here’s the signed scope tied to the line items we priced.”
Here’s a human-friendly way to modernize sub onboarding without turning your business into a bureaucracy. The secret is turning a messy, recurring process into a guided workflow your team can run in their sleep.
Each sub gets a profile: company name, contacts, trade, tax docs, insurance, rate notes, preferred payment method, past jobs, and the stuff you always forget until you need it. The next time you book them, you’re not starting from zero. You’re verifying what changed.
If your team is always hunting for documents, central file storage helps a ton. Bolster Drive is built for that “where is the latest file?” reality.
Insurance is only useful if it’s valid. Store the COI with an expiration date. If it expires mid-project, you want a nudge before it becomes your problem. Same idea with licenses in regulated trades, and lien waiver collection on jobs where you know it will matter.
Take the parts of the estimate the sub owns and write the scope in plain language:
“Demo and remove existing tile backsplash (45 LF). Protect counters. Haul debris. Excludes drywall repair beyond skim coat.”
Then tie it back to the exact quantities, line items, and allowances you priced. A scope that reads like a human wrote it, and balances like an accountant checked it, gets signed faster and argued less.
This is the cleanest rule you can adopt.
If the sub profile is incomplete or the scope is unsigned, you do not release a start date, PO, or deposit. That’s not you being “hard.” That’s you being consistent. Consistency is what prevents exceptions from becoming your standard.
When site conditions change, keep the same rhythm every time:
The moment the sub confirms, you memorialize it, and your client-facing approval stays clean. No side deals. No gray area. Everyone’s looking at the same number.
Bolster’s strength is turning moving parts into a guided flow that stays connected from estimate to execution. That applies to subs too.
Store W-9s, COIs, endorsements, and trade licenses in one place, and keep them attached to the job record so your PM is not digging through old threads. If you want your files and photos organized with the job, Bolster Drive helps keep it clean.
Build scopes directly off your assemblies and line items, then send them as the “official truth” your team actually runs. You are not writing new paperwork. You are re-using the scope you already sold.
Tie scheduling, purchase orders, and deposits to completed onboarding steps. If a COI expires, it should be a flag, not a surprise on pour day.
When changes happen, keep them in one workflow so the sub, the client, and your budget all agree. No gray-zone texts. No “we’ll figure it out later.”
The outcome is not more admin. It’s less. Because you enter the truth once, and everything else inherits it.
Yes. Their quote can be an attachment, but your scope ties to your estimate, your terms, and your budget. It’s the version that protects you and keeps the project coherent.
If the market moves, memorialize it as a change with a reason. You’ll sleep better when you can sort margin hits by actual causes instead of vibes.
Only the first time. After that, you’re reusing the last profile, updating what changed, and sending a clean packet. The old way felt fast until week three, when you start chasing signatures and explaining overages.
The best subs don’t want chaos either. They want to show up, do great work, get paid fast, and avoid surprises. A consistent onboarding flow signals you run a tight ship. It creates a shared language for scope, price, and risk, so you can work together again and again without renegotiating reality every project.
And once onboarding is consistent, you can finally analyze it: which trades trigger the most change orders, which scopes slip schedules, which reasons hit margin most often. You can’t fix what you can’t see, and you can’t see what you never formalize.
If you’re tired of starting every job with a small storm of PDFs and promises, make sub onboarding part of your standard project recipe. One profile. One scope. One signature. Then let Bolster carry the details across estimates, schedules, and payments.